Major client requested methodology to lift and rotate a 70 Tonne fabrication. Design lifting plates and provide heavy lift engineer to produce a lift plan and manage the lifting and rotating process.
This involved working with ships surveyor in the positioning and welding of stoppers and D rings for lashing. Work carried out in an efficient and timely manner to minimise de-murage costs.
Upon the closure of a major aerospace maintenance facility we were asked to remove the engine test rig from its concrete structure and secure in transport frame for onward shipping to the US.
Aircraft maintenance facility requested statutory thorough examination of a number of aircraft jacks. During the thorough examination a load test was applied.